812-631-2374
812-631-8834
|
Operations (Paul)
|
AP, AR, HR (Terri)

Past Projects

Crane P340 B3334 Addition Design-build

December 2011 – April 2012
B&D Electric, Greg Hauser
Network Cabling: Design-build and installation of 950 connection Category 6 F/UTP data network, Single and Multimode Optical Fiber networks, and coaxial television distribution

Indiana University Chemistry Building Rewire

January 2012 – May 2012
Matrix Integration, Drue Best
Network Cabling: Approximately 1,620 Category 6 Horizontal Connections and Certification, Equipment Room and 9 Telecom Rooms, Multimode and Single Mode Fiber Backbone, Cable Management, Manufacturer's System Warranty

Lebanon High School Renovation Design-build

February 2012 – December 2013
Shiel Sexton, Doug Adams
Network Cabling: Approximately 1,850 Category 6 Horizontal Connections and Certification, Equipment Room and 8 Telecom Rooms, Multimode and Single Mode Fiber Backbone, Cable Management, Manufacturer's System Warranty
Audio-Video: 75 Classroom Presentation Systems including SMART Boards, Projectors, LED TVs and Sound Reinforcement; Presentation and A/V Control Systems for the Cafeteria, Choir Room, Band Room, Community Room and Auditorium
Paging & Intercom: School-wide Talk-back Paging System

City of Huntingburg Technology Upgrade

May 2011 – May 2014
City of Huntingburg, Mayor Denny Spinner
Engineering & Consulting: Advise the city on the installation of a city-wide, city-owned fiber optic network, VoIP Telephone System, Network Infrastructure and operating best practices

Harrison County Medical Office Building

September 2008 – January 2009
Weyer Electric, Fred Weyer
Network Cabling: Approximately 375 Category 6 Horizontal Connections and Certification, 2 new Telecom Rooms, Multimode Fiber Backbone, Cable Management, Manufacturer's System Warranty

Avon River Birch Elementary School

November 2008 – June 2010
Matrix Integration, Drue Best
Network Cabling: Approximately 700 Category 6 Horizontal Connections and Certification, Equipment Room and 3 Telecom Rooms, Multimode Fiber Backbone, Cable Management, Manufacturer's System Warranty
Audio-Video: 45 Classroom Projector mounts, Media and Media Control Cabling

Crane P341 Building 3330W Design-build

April 2010 – November 2010
B&D Electric, Greg Hauser
Network Cabling: Design-build and installation of 2,500 connection Enhanced Category 5 F/UTP secure data networks, Single and Multimode Optical Fiber secure networks, and coaxial television distribution

Carmel High School Audio-Video Systems Upgrade

June 2010 – November 2010
Matrix Integration, Drue Best
Audio-Video: 200 Classroom Installation of Projectors, Projection Screens, Speakers, Audio-Video Equipment, Cabling and distribution equipment, 32 LCD TVs in public spaces and offices.